- Position: Technical Engineering Manager
Company: Hascon Eng s.p.a(Italy co) , Consul MISE co, TAM co
Senior Piping Designer & 3D Model in Projects:
Working on piping design of Bardsir steel Marking plant(Fournace 140 ton EAF+LF&MH)
Established specific Job Specification for Piping ( Job Specification Fabrication & Field Installation , …)
Checked and coordinating Equipment nozzle orientation.
Establish & Setting of admin of project to start modeling of Project by Engineering Software (P.D.M.S).
Writing Catalogue with Paragon Module from PMS by Engineering Software (P.D.M.S).
Setting of Title Block of project for Isometric & Piping Arrangement generation by Engineering Software (P.D.M.S).
Modeling instruction & Model review by software(NawisWorks, Review Reality)
Training and development of subordinate.
Generating MTO from all consortium models on the 1st, 2nd & 3rd phase of project.
Generating piping arrangement & Equipment drawing by Engineering Software (Plant Wave).
Preparation of line list, MTO & Route Study.
Consideration of site TQ and site visit to solve some piping problems.
Preparation of As-Built drawings & correction on PDMS Model by Engineering Software (P.D.M.S).
PDMS Design training of project engineering disciplines.
Piping technical proposal estimation.(Estimate of weight, cost & preparation of bulk materials)
Attended technical meeting with clients.
Checking of Isometric Drawings with respect to P&ID.
Prepare Bill of Material sheets for each Isometric in the same Drawing.
Working on Bardsir steel Marking plant's site as piping designer supervisor .-2011
- Position: Manager of Design & Engineering
Company: IOTC
Analytical & 3D modeling of Submerging Rotary jet (SRJ)in storage tank in kharg Island.-2013
- Position: Manager of Design & Engineering
Company: Esfahan Steel Company (ESCO)- FLS (Denmark co) –JDEVS
Working on piping& Equipment& HVAC& structure design in Dimasus & zinterband in Esfahan steel plants:
Piping Design, Equipment Modeling by Engineering Software (P.D.M.S).
Modifying Isometric Drawings with respect to P&ID .
Check and coordination of Equipment nozzle orientation.
Writing Catalogue with Paragon Module from PMS by Engineering Software (P.D.M.S).
Check the overall Plot plan & Update Plot plan
Check the foundation plan of all subcontractors
Check the U/G layout of project & check the position & clashing with cable or foundation
Check the Piping routing of all subcontractors & comment them for developing their piping (if necessary)
Check the nozzle orientation of all sub-contractors & comment them. (If necessary)
Check the piping facility of single line diagram-2011
- Position: Manager of Design & Engineering
Company: Esfahan Steel Company (ESCO)- FLS (Denmark co) –JDEVS
Working on piping& Equipment& HVAC& structure design in Dimasus & zinterband in Esfahan steel plants:
Piping Design, Equipment Modeling by Engineering Software (P.D.M.S).
Modifying Isometric Drawings with respect to P&ID.
Check and coordination Equipment nozzle orientation.
Writing Catalogue with Paragon Module from PMS by Engineering Software (P.D.M.S).
Check the overall Plot plan & Update Plot plan
Check the foundation plan of all subcontractors
Check the U/G layout of project & check the position & clashing with cable or foundation
Check the Piping routing of all subcontractors & comment them for developing their piping (if necessary)
Check the nozzle orientation of all sub-contractors & comment them. (If necessary)
Check the piping facility of single line diagram-2011
- Position: Manager of Design & Engineering
Company: National Iranian Copper Industrial(NICI) - FLS (Denmark co) –JDEVS
Working on piping& Equipment& HVAC& structure design in khatunabad plants:
Piping Designing, Equipment Modeling by Engineering Software (P.D.M.S).
Modifying Isometric Drawings with respect to P&ID.
Check and coordination of Equipment nozzle orientation.
Writing Catalogue with Paragon Module from PMS by Engineering Software (P.D.M.S).
Check the overall Plot plan & Update Plot plan
Check the foundation plan of all subcontractors
Check the U/G layout of project & check the position & clashing with cable or foundation
Check the Piping routing of all subcontractors & comment them for develop their piping (if necessary)
Check the nozzle orientation of all sub-contractors & comment them. (If necessary) -2008
- Position: Technical Engineering
Company: National Iranian Copper Industrial(NICI) - ACTEA (Italy co) –JDEVS
Working on piping& Equipment& HVAC& structure design in sarcheshmeh Scrubber plants (EPC):
Major activity in design:
Nozzle orientation & Ladder & Platform Layout
Updating plot plan according to piping design requirement
Route study & Piping design in CDU/VDU unit in SAR project
Check the related U/G layout of unit & specify the position of catch basin & M/H according to design
Preparing U/G fire water generation drawing & design of A/G to Desalted
Generating Isometric drawing from model
Generating piping arrangement & Equipment drawing with plant wave software
Participate in P&ID Mechanization.
Preparation of single line drawing for steel structures.
Preparation of line list, MTO & Route Study.
Consideration of site TQ and site visit to solve some piping problems.-2007
- Position: Technical Engineering
Company: Tehran Cement- FLS (Denmark co)- JDEVS
Working on piping& Equipment& HVAC& structure design of Line 6 in cement Tehran plants:
Piping& HVAC Designing, Equipment Modeling by Engineering Software (P.D.M.S).
Modifying Isometric Drawings with respect to P&ID.
Writing Catalogue with Paragon Module from PMS by Engineering Software (P.D.M.S).
Check the overall Plot plan & Update Plot plan -2010
- Position: Manager of Design & Engineering
Company: Margun Cement- FLS (Denmark co)- JDEVS
Working on piping& Equipment& HVAC& structure design of Line6 in cement Margun plants:
Piping& HVAC Designing, Equipment Modeling by Engineering Software (P.D.M.S).
Modifying Isometric Drawings with respect to P&ID.
Writing Catalogue with Paragon Module from PMS by Engineering Software (P.D.M.S).
Check the overall Plot plan & Update Plot plan -2010
|